Instructions / Assembly

INSTALLATION
The BioShift chamber comes with a set of attached mounting brackets. It can be installed
in a number of ways depending on the wall or door that will support them. A 30.25’ x
24.5’ (768 x 622mm) cutout is recommended to support the chamber when mounting.
Note: The BioShift chamber can be installed in dry locations only (Pour emplacements secs
seulement). Product is approved for indoor use at an altitude up to 2000m.
The input power switch is customizable to the clean or dirty side of the chamber. If this
is desired, contact Once for further instructions.
1. Remove screws (4) on mounting brackets located on both sides of the chamber
and set aside for later use.
2. Using screws or nails (not provided), attach removed panels to support beams. Use
as many screws or nails needed to ensure panel is securely held to beams.
3. Using two people, carefully slide BioShift chamber into place and secure panel to
unit using four screws removed in Step 1.
4. Plug supplied power cord into standard electrical outlet. Note: Alternate power
cords not permitted.
For small object disinfection, position tray in the center slot for optimal cleaning.
For larger, heavier objects, position tray in the bottom slot.
Removal
Always de-energize/disconnect power before moving.
6