Manual

34
Trial operation preparation
Cold water shut-off valve
Hot water
shut-off valve
Hot water heater
(Not included with the product)
Function module
Cold
waterwater
Hot water
Power supply cord
(when flowing)
1
Confirm that electric power is
being supplied.
This should be performed after
confirming that the bathtub is empty.
2
Supply temperature: 140 to 158°F (60 to 70°C)
Supply pressure: 29 to 108.75 psi (0.20 to 0.75 MPa)
Supply water
pressure: 29 to 108.75 psi
(0.20 to 0.75 MPa)
(when flowing)
Open the hot and cold water shut-off valves connected
to the function module.
The position of the water shut-off valve will vary from place to place.
Please supply hot and cold water to the function module by opening the shut-off valves.
Hot water
Trial operation
Please run the unit in order of operations (1) to (6).
Do not apply pressure to the equipment itself.
(1) Bathtub data reset
Open the bathtub drain valve and empty the bathtub.
Set the On/Off button on the controller to OFF.
Turn the to ON.
Please open the drain valve of the bathtub so that no water remains in the bathtub.
The draining operations will end automatically after approximately 2 minutes.