Manual

21
(4) Finishing the tiles
Please build a deck around the perimeter with an apron and tiles.
Before installing the deck, please fill the bathtub with water, test run it and check for leaks around the pipe
connections. Please refer to the POO concerning test runs.
Before tiling the deck surface, determine the position of the remote control stand and insert a sheathing pipe for the
cable.
Be sure to leave a gap in the space between the bathtub and the tiles and then fill in the gap between the bathtub
and the tiles using an alcohol-free type of silicone.
Please arrange for a joint-backing material on site.
Also, when forming the deck apron, please be sure to affix the joint-backing material to the deck surface or the back
surface of the bathtub rim before putting the tub in place. It may not be possible to apply the joint-backing material
after the bathtub has been put in place.
Deck
Inspection port
(at least 15 x 15 inches)
Inspection port
(at least 15 x 15 inches)
Inspection port
(at least 15 x 15 inches)
Controller Stand Attachment Module
Tile insertion
Within
5 mm
Within
5 mm
Joint backing
material
Joint backing
material
Silicone
Silicone
Convoluted
Flexible
Tubing
Bathtub
within 3mm
Tile insertion