Manual
20
6-2 Finishing
(1) Fixing the bathtub in place
● Please fix the bathtub in place using mortar or a powerful adhesive.
Caution: Please be careful not to get any mortar or adhesive on the bathtub itself.
(2) Plumbing and connecting the hot/cold pipes and the fill-tub pipe
● Please connect the connecting plumbing installed on the bathtub to the hot/cold water supply pipes and the fill-tub
pipe that were set up in advance.
(3) Connecting the cables
● Please connect the fill-tub unit and the connecting junction cables to the respective cables on the bathtub side.
❈ Check the tags on the junction cable and the bathtub-side cables when making the connections.
Mortar Mortar
Tag
Connector
Controller Stand Connector
(see 6-3 Controller Stand Installation (4))