Finish decking and seal bathtub
ABA & ABY Installation (continued)
Connect the drain to plumbing
• Follow local codes
• Make sure that connections are tight to avoid leaks.
5
Make electrical connections (AirBath)
• All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.
• Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.
• The controller, blower and GFCI must be accessible.
6
7
With Flange
Silicone
With Tile-in Flange
• Pre-drill pilot holes through the tile-in flange.
• Mount with screw or nail to studs.
• Finish tiling the bathtub deck and be sure to seal the
bathtub lip to prevent leaks.