Owner's manual

Finish decking and seal bathtub
ABA & ABY Installation (continued)
Connect the drain to plumbing
Follow local codes
Make sure that connections are tight to avoid leaks.
5
Make electrical connections (AirBath)
All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.
Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.
The controller, blower and GFCI must be accessible.
6
7
With Flange
Silicone
With Tile-in Flange
Pre-drill pilot holes through the tile-in flange.
Mount with screw or nail to studs.
Finish tiling the bathtub deck and be sure to seal the
bathtub lip to prevent leaks.