User Manual
Finish decking and seal bathtub
ABA & ABY Installation (continued)
Connect the drain to plumbing
• Follow local codes
• Make sure that connections are tight to avoid leaks.
5
Make electrical connections (AirBath)
• All electrical connections must be made by a licensed electrician and
meet local codes. Refrain from using extension cords.
• Class A, 15 amp Ground Fault Control Interrupter (GFCI) with grounding
is required.
• The controller, blower and GFCI must be accessible.
6
7
With Flange
Silicone
With Tile-in Flange
• Pre-drill pilot holes through the tile-in flange.
• Mount with screw or nail to studs.
• Finish tiling the bathtub deck and be sure to seal the
bathtub lip to prevent leaks.
Silicone
Finished Surface
Optional Under Mount
• See spec sheet to determine if this is available
• Cut finished surface to desired dimensions.
• Dry fit to the bathtub.
• Temporarily mark on the bathtub the edge of the opening of the finished surface.
• Remove the finished surface and apply silicone to the bathtub (underneath the
finished surface location).
• Replace the finished surface and secure it.
• Add and/or remove silicone as desired.
• Make sure the finished surface is not supported by the bathtub and is secured per
local codes.










