Instructions / Assembly
9
Shelterguard®
Estimator/Order Guide 
Accessories
Determine the total lineal feet of each condition listed below and then fill that number in on each line. Use the equations 
on previous pages to calculate the number of pieces for each item and circle the flashing design required. 
Eave ___________ 
Ridge__________ 
Hip____________ 
Gable __________ 
Sidewall 
Endwall__________ 
Valley__________    Transition _________ 
Gambrel _______ 
Skylight/Chimney width = ______
Eave: 
ft ÷ 10 = pcs. CE-1 EAVE 
Ridge: 
ft ÷ 10= pcs AR-3 OR RR-1 RIDGE CAP 
        Note: For vented ridge use AR3 with Profile vent (below) or AR3 with Versavent 
attached 
Gable: 
ft ÷ 10 = pcs RG-1 OR WG-1 GABLE TRIM 
Sidewall and Endwall: (____ ft. sidewall + ____ ft. endwall) ÷ 10 = _____ pcs. ASW-1 TRIM 
Hip: _______ ft. ÷ 10 = _______ pcs. RR-1 RIDGE CAP 
Valley: 
ft ÷ 10 = pcs RV-1 OR RV-2 W-VALLEY 
Slope Transition: 
ft ÷10 = pcs AT-1 TRANSITION TRIM  
Gambrel: 
ft ÷ 10 = pcs AT-2 GAMBREL TRIM 
FASTENER CALCULATIONS: 
Panel Screws: Quantity will vary based on spacing of fastener rows. 
♦  For solid decking, use #14 x 1” MP screws. 
♦  For 2 x 4 purlins, use #9 x 1” Woodfast screws 
Fastener Spacing Panel Screws per 
 lineal foot of Roofing
 12”   4.5 
 18” 3.0 
 24” 2.5 










