Instructions / Assembly
10
Fabral.com
ESTIMATING & ORDERING
Step 3 (cont.)
A. Eave _____ ft ÷ 10** = _____ pcs. (WEF1 or WEF2 & WEF3 or WEF4)
B. (Ridge _____ ft ÷ 10) *** + (Hip _____ ft ÷10) = _____ pcs (WRH3 or WRH5)
C. Gable _____ ft ÷ 10 = _____ pcs (WGF4)
D. Sidewall _____ ft ÷ 10 = _____ pcs (WSW4)
E. Endwall _____ ft ÷ 10 = _____ pcs (WEW2) Pitch _________
F. Valley _____ ft ÷ 10 = _____ pcs (RV2 & WVC1) Pitch _________
G. Transition _____ ft ÷10 = _____ pcs (WTF1 & WVC1) Pitch from to ________
H. Gambrel _____ ft ÷ 10 = _____ pcs Mod. (WTF1 & WVC1) Pitch from to ________
I. Monoslope _____ ft ÷ 10 = _____ pcs. (WRH4)
J. (Perimeter of Skylights/Chimney _____ ft ÷5) = _____ pcs WSCB1 & _____ pcs WSCT3
K. (Total lineal feet of panels _____ ft) = _____ pcs #10 x 1” Waferhead Screws (Panels)
L. (Valley _____ ft x 2) + (Transition _____ ft ) + (Gambrel _____ ft ) + (Swept Wing Gable ft ) =
_____ pcs #10 Waferhead Screws (Accessories)
M. (Eave _____ ft) + (Ridge _____ ft x 6) + (Gable _____ ft ÷ 2) + (Sidewall _____ ft) +
(Endwall _____ ft x 3) + (Hip _____ ft x 6) + (Transition _____ ft x 3) +
(Gambrel _____ ft x 3) + (Monoslope _____ ft x 4) = _____ pcs #14 x 1” Mill Point Painted
N. (Ridge _____ ft x 2) + (Sidewall _____ ft) + (Endwall _____ ft ) + (Hip _____ ft x 2) +
(Transition _____ ft ) + (Gambrel _____ ft ) + (Monoslope _____ ft ) =
_____ pcs #12 x ¾” Stitch Screw Painted
O. (Eave _____ ft x .0125) + (Valley _____ ft x .0125) + (Swept Wing Gable _____ ft x .0625) =
_____ Tubes of Sealant
P. (Eave _____ ft) + (Gable _____ ft) + (Ridge _____ ft x 4)*** + (Valley _____ ft x 2) +
(Transition _____ ft x 3) + (Gabrel ___ ft x 3) + (Perimeter of skylight / chimney ______ ft)
+ (Sidewall _____ ft ) = _____ Total lf ÷ 40 = _____ Rolls of Butyl Sealant
Q. Hem Bending Tool = _____ pcs Hem Bending Tool
R. (Hip _____ lf x 2) ÷ 19.68 = _____ rolls.- Sealer Strip (1” x 1” x 19.68’ roll)
S. (Non-Vented ridge ____ ft ÷ 1.33) + (Transition ___ ft ÷ 2.66) + (Gambrel ___ ft ÷ 2.66) =
_____ pcs HORIZON S Outside Closure x 32”, pre-notched (covers 2 panels)
T. (Vented Ridge ft ÷ 1.33) = ______ pcs. Marco LP2 Vent (Sold by pcs.)
U. Pipe Boots: _____ #3 ( ¼“ to 5” dia. pipe ) _____ #5 ( 4 ¼” to 7 ½” dia. pipe)
_____ #8 ( 7” to 13” dia. pipe) (add screws and sealant for boots)
** Note: 10 results from 10’6” standard length ashings with 6” overlap.










