Instructions / Assembly
17
Step 1
TWO-PIECE EAVE TRIM ONE-PIECE EAVE TRIM
(Use when roof pitch is greater than 6:12) (Use with roof pitches up to 6:12)
1. Line WEF2 or WEF1 top
in line with plywood/purlin.
2. Screw at 12” o.c. across
face of trim
3. Hook WEF3 over hem
entire length.
4. Tack in place with roong
nail.
5. Extend felt over eave trim.
Step 2
Step 3
6. Mark 1” in pan of panel and cut
beside each rib with a tin snips.
7. Use bending tool to bend hem
under the panel.
8. Cut underlap leg off completely
for 1”
9. Cut overlap leg as shown on angle
Cut to produce a triangular piece
to fold, closing the open rib.
Step 4
Horizon S Panel
10. Caulk with One-Part Polyurethane up underlap leg.
11. Slide panel over eave hem, tight (in cold weather) or with gap
(in warm weather). Snap panels together by applying pressure
to the panel rib. Start at the eave and work toward the ridge.
HORIZON S TRIM DETAILS










