Instructions / Assembly

HORIZON S TRIM DETAILS
28
Fabral.com
SKYLIGHTS
View installation videos at Fabral.com/videos
PROCEDURE FOR THE INSTALLATION OF SKYLIGHT FLASHING
Notes:
1. Do not fasten down the panels a minimum of 24” uphill from the skylight.
2. Whenever possible, position the skylight curb so the ribs of the roof panels do not interfere with the ash-
ing.
3. Cut the HORIZON S panels as close to the left, right and downhill sides of the curb as possible. Cut the
uphill side 6” up from the curb as indicated above.
Notes:
1. The skylight ashing will be 4” wider than the width
of the curb (2” on each side).
2. Cut a 1/8” slot in the two uphill corners of the
HORIZON S panels, slightly wider than 2” so the uphill ash-
ing can slide through the two slots.
Note: Contact Fabral regarding skylight details when sky-
light is downslope more than 10 ft. down from ridge. Appli-
cations where this is present may cause panel distortion due
to thermal movement.