Operation
Prior to filing your new bin for the first time, you should check the following:
1. All bolts are in place and properly tightened.
2. All ladders, handrails, stairways are securely in place.
3. The bin has been properly anchored to the foundation.
4. Unloading equipment operates freely and all control gates are operable.
5. The inner door panels of the sidewall door should be tightly closed.
6. The sweep arm of built-in sweep systems is positioned over the
intermediate sumps.
8. The working areas around the bin are clean and free of clutter.
9. All guards and shields are in place.
NOTE: Refer to the installation and operations manual of the control panel
for information pertaining to the actual drying operation of the Ezee Dry.
44
install the aeration fan and floor
Install the lower aeration fan and
transition. Install the floor and floor
supports per the instructions provided
with the floor.
45
install the control and all wiring
Install the dryer control per the
instructions provided with the control
unit. Wire and plumb the fans and other
electrical and heat devices according
to the instructions provided by the
manufacturer. MFS/YORK/STORMOR
strongly suggests that all wiring and gas
plumbing be done by a qualified electrician
familiar with this type of equipment.
46
install the control and all wiring
READ AND UNDERSTAND YOUR
OPERATIONS MANUAL PRIOR TO
ATTEMPTING TO USE THE EZEE
DRY BIN. FOLLOW THE SAFETY
ADVISORY INFORMATION GIVEN
IN ALL AREAS OF THE ASSEMBLY
AND OPERATORS MANUALS.
Contact MFS/YORK/STORMOR
engineering department with ANY
questions at (308) 384 - 9320.