Owner`s manual
34
015885 rev 10-00
CHART 1
Bin Diameter
Hgt. Above
Concrete
18' 134 3/4"
21' 146 1/4"
24" 157 5/8"
27' 169 1/8"
30' 180 5/8"
STEP 12
After the eave clips have been installed,
support the peak ring on a stand at the
approximate height shown in the chart below.
STEP 13
There are 36 roof sheets on each Ezee Dry bin.
(The 18’ bin has 34 standard sheets plus one
double wide manhole sheet.) There are several
methods to successfully complete the
construction of the roof, but in order to
maintain an even weight distribution on the
peak ring we recommend the following
procedure. Regardless of your paticular method
the peak ring MUST be level and we strongly
recommend the use of an adjustable center
jack. Once the eave clips have been fastened
to the sidewall, install the numbers 1, 9, 19,
and 27 roof sheets. Use 5/16” x 1” bin bolts at
both the peak ring and eave clips (fig b and c).
STEP 14
Install every other roof sheet, leaving one roof sheet
space between each sheet installed (fig d and e).
a
d
b
center jack
roof sheet
temp.
support
peak ring
height (B)
diameter (A)
c
e
1
9
19
27
1
35
29
27
25
23
21
19
17
15
13
11
9
7
5
3
f
33
31
1
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
2
4
6