Assembling the Bin
STEP 1
Sort the sidewall sheets according to the layout shown in this manual (page 48 - 49) by
gage according to color code. Stand the sheets on edge according to the sequence in
which they will be used on the bin pad near the location where the wall will be placed.
STEP 2
Build the second full width sidewall ring from
the top of the bin on the pad first (fig. b and c).
Refer to the sidewall gage schedule on page
48 - 49. Make sure to use the proper number
and style of sheets so the diameter of the bin is
correct. Make sure each sheet overlaps its
adjoining sheet in the same direction (fig. d).
For Ezee Dry bin door and fan unit locations
refer to fig. g. Make sure to use sealer tape on
the vertical sheet seams of these and all other
corrugated sheets in your Ezee Dry Bin (fig. e).
Install 5/16” x 1” Bin Bolts in the “outside
corrugation valleys” of the vertical sheet seams
at this time (fig. f) as the Vertical Outside
Stiffener Bolts will be added later in the “hill”
holes of the sheets.
b
e
c
d
g
f
two fan entrancesone fan entrance
door
door
sealer tape
hill
valley
sheet layout with 1 fan
sheet layout with 2 fans
ring built in step 2
fan
entrance
fan
entrance
fan
entrance
door
door
114”
114”
114” 58”
114”
114”
114”
58”
58”
58”