Owner`s manual
15
015885 rev 10-00
CHECK DELIVERY
Your bin has been carefully checked before shipment. However, you should check your
shipment upon arrival using the Packing List provided to insure it is complete.
SIDEWALL SHEET IDENTIFICATION
As an aid in identifying corrugated sheets on the packing list a series of codes are used in the
description. Typically the description begins with βCOR SHT XX-YYZ ....β Where XX is the
diameter of the bin; YY is the gage; and Z is one or more alpha numeric code designations.
The codes used are as follows:
5 = Half sheet for entrance collar
6 = Door sheet for double punched sheets
7 = Door sheets for single punched sheets
E = Sidewall sheet punched for Ezee Dry Stiffener
F = Sidewall sheet punched for flashing
H = Half height top sheet
N = Ezee Dry fan entrance sheet
P = Double punched sidewall sheet
R = Ezee Dry tension ring sheet
T = Transition sheet
Examples:
COR SHT 18-17EF is an 18β diameter sheet punched for Ezee Dry stiffeners
and flashing.
COR SHT 30-19ER is a 30β diameter sheet punched for Ezee Dry stiffeners and the
tension ring.
TORQUE specifications for the fasteners that bolt your bin together are listed below. Have
your contractor demonstrate that he is giving you the correct torque.
When you load or unload grain, always do it from the center. This creates an even load on the
structure. Only use your intermediate sumps for CLEAN-UP. Off-center loading and unloading
creates excessive STRESSES and can cause a failure.
All bins should be filled at the center of the peak ring with an auger or spout of adequate
length to allow grain to drop straight down into the bin.
Do not cut openings in bins. This reduces the structural strength of the unit and can cause
partial or complete failure.
Bolt Size Torque (ft/lbs)
5/16" Grade 8.2 25
3/8" Grade 5 31










