Owner`s manual

14
015885 rev 10-00
1.
Bin capacities are approximate figures. The capacities shown above are based on 1.25 cubic
feet per bushel and a compaction factor of 6% in accordance with ASAE voluntary standards.
2. Capacities are in bushels calculated as follows:
Capacity:
Grain loaded level 2 rings below the Ezee Dry tension angle less 13” floor.
Batch:
The amount on the plenum floor during a batch drying cycle.
CAUTION
All galvanized steel is subject to oxidation, sometimes called “white rust” when exposed to
moisture from any source. Care should be taken to protect sidewall sheets and roof sheets as
much as possible. INSIDE STORAGE IS ADVISABLE. When on the job site, sheets should
be placed on edge far enough apart to allow air to circulate freely.
EZEE DRY BIN CAPACITY TABLE
Rings
18' 21' 24' 27' 30'
Capacity Batch Capacity Batch Capacity Batch Capacity Batch Capacity Batch
7 1/2
2820 540 3853 750 5054 1000 6331 1200 7834 1500
8 1/2
3384 540 4622 750 6051 1000 7600 1200 9401 1500
9 1/2
3948 540 5390 750 7059 1000 8869 1200 10968 1500
10 1/2
_ _ _ _ 8061 1000 10138 1200 12535 1500
11 1/2
_ _ _ _ 9063 1000 11407 1200 14102 1500