Owner`s manual

64
015886 5-02
Operation
Prior to filing your new bin for the first time, you should check the following:
1. All bolts are in place and properly tightened.
2. All ladders, handrails, stairways are securely in place.
3. The bin has been properly anchored to the foundation.
4. Unloading equipment operates freely and all control gates are operable.
5. The inner door panels of the sidewall door should be tightly closed.
6. The sweep arm of built-in sweep systems is positioned over the
intermediate sumps.
7. The working areas around the bin are clean and free of clutter.
8. All guards and shields are in place.
NOTE: Refer to the installation and operations manual of the control panel
for information pertaining to the actual drying operation of the Ezee Dry.
55
read the operations manual
READ AND UNDERSTAND YOUR
OPERATIONS MANUAL PRIOR TO
ATTEMPTING TO USE THE EZEE
DRY BIN. FOLLOW ALL OF THE
SAFETY ADVISORY INFORMATION
FOUND IN THE CONSTRUCTION
AND OPERATOR’S MANUALS.
Contact the Engineering Department
of MFS/YORK/STORMOR with ANY
questions at (308) 384 - 9320.