Owner`s manual

56
015886 5-02
45
bolt on the bottom sidewall ring
Install the bottom ring of sidewall
sheets, making sure the floor flashing
holes are at the proper height to match
the floor supports. Entrance collar
sheets are available as an option for
the aeration fan. Bolt these three
sheets together along with a section
of base angle (fig. a). Install the
transition on to the entrance collar and
bolt this assembly to the bottom
sidewall ring.
46
attach the entrance collar adaptor
If 13” floor supports are used field
drill the holes in the entrance collar
for the adaptor. The adaptor should
fit flush on the inside and at the top.
Adaptor holes will be toward the
bottom (fig. b).
47
complete entire base angle installation
Finish installing the base angle all the
way around the bottom ring using the
base angle connectors (fig. c). All the
hardware for the base should be
packaged separately.
Bin Completion
INSTALL THE BASE ANGLE CONNECTORS
c
base angle
base angle connector
ATTACH THE ENTRANCE COLLAR ADAPTOR
b
adaptor
entrance collar
BOLT TOGETHER THE ENTRANCE COLLAR ASSEMBLY
a
48” sheet
67” sheet
entrance collar
base angle
NOTE: Entrance
collars are optional