Owner`s manual
45
015886 5-02
CONTINUOUS FLOW AND BATCH DRYING GRAIN BAND AND GRAIN BAND POST LAYOUT
b
3”
6”
6”
7”
4”
4”
11”
4”
5”
4”
14”
42 1/2”
42 1/2”
29 11/16”
(6) 15” perforated grain band (which overlaps the
10” grain band)
(12) field drill hole for
perforated band clip
(6) 10” grain
band x 68” long
(6) 7” grain
band x 68” long
(6) 7” grain
band x 68” long
(6) grain band posts
(12) grain band posts
(12) 15” grain
band x 68” long
(12) 7” grain
band x 68” long
(12) 7” grain
band x 68” long
(16) 15” grain
band x 68” long
(16) 7” grain
band x 68” long
(16) 7” grain
band x 68” long
(16) grain band posts
(16) grain band posts
(16) 7” grain
band x 68” long
(16) 15” grain
band x 68” long
(16) 7” grain
band x 68” long
bin center
center collar
plenum sheet
plenum sheet top
center collar
plenum sheet top
bin center
(12) field drill hole for
perforated band clip
(6) grain band posts
(12) grain band posts
(12) grain band posts
(12) grain band posts
29 11/16”
42 1/2”
42 1/2”
(6) 15” perforated grain band (which overlaps the
10” grain band)
(6) 10” grain
band x 68” long
(6) 7” grain
band x 68” long
(6) 7” grain
band x 68” long
(12) 15” grain
band x 68” long
(12) 7” grain
band x 68” long
(12) 7” grain
band x 68” long
(16) 15” grain
band x 68” long
(16) 10” grain
band x 68” long
(16) 15” grain
band x 68” long
(16) 7” grain
band x 68” long
(16) 7” grain
band x 68” long
plenum sheet
4”
7”
7”
2”
4”
10”
4”
16”
2”
4”
10”
Continuous Flow Ezee Dry
Batch Drying Ezee Dry
30
install the grain band rings
Attach the grain bands as shown.
42 1/2”
42 1/2”










