Owner`s manual

38
015886 5-02
21
support the peak ring at proper height
After the eave clips have been installed,
support the peak ring at a height of
222” above the concrete (fig. b).
22
begin installing roof sheets
There are 36 roof sheets on the 36’ Ezee
Dry Bin. There are several methods to
successfully complete the roof assembly, but
in order to maintain an even weight
distribution on the peak ring we recommend
the following procedure. Regardless of the
method chosen the peak ring
MUST be
level and we strongly recommend using an
adjustable center jack. Once the eave clips
have been fastened to the sidewall, install
the numbers 1, 11, 19, and 29 roof sheets
(fig.s c and d). Use 5/16” x 1” bin bolts at
both the peak ring and eave clips.
PEAK RING HEIGHT ABOVE CONCRETE
b
222”
gauge
distance
CENTER TO CENTER DISTANCE
a
FIRST ROOF SHEETS PLACEMENT
c
1
11
19
29
TOP VIEW 1ST ROOF SHEETS LOCATION
d