Owner`s manual
27
015886 5-02
HEIGHT OF CENTER COLLAR
c
14’ - 3 3/8”
4
install the first truss
Set the center collar in the bin’s center
(fig. a, page 28) at the height shown
(fig. c). Use a center jack platform. The
center collar should be oriented so that
the pulley mounting angle attachments
are on the bottom. Insert a bolt through
the first truss and the stiffener using either
of the two top holes in the stiffener and
truss (refer to fig. b, page
28). (The lower
two holes are for stiffener tie rods.) Bring
the top of the truss into position next its
corresponding flange on the center collar.
Insert a bolt through the flange and the
truss to hold the truss in place and then
install the rest of the bolts.
3
fasten the top stiffeners
Bolt the twelve top 10 gage z-bar stiffeners
to the sidewall at the vertical seams of the
10 gage sidewall ring as shown (fig. b).
The top z - bar stiffener is 42 1/8” long.
Dryer Assembly
truss
sidewall
center collar
top z-bar stiffener
jack beam
NOTE:
The two lower holes in the
upper stiffener are for the tie rods.
NOTE:
Use 5/16” flange nuts at
all stiffener locations on the side
of the stiffeners.
TOP STIFFENER ATTACHMENT
b
14 21/32”
top 10 gage
z-bar stiffener
15 gage
sidewall sheet
holes for
tie rods
holes for
3/4” main
purlin bolts
with nuts
10 gage sidewall
sheets (2nd ring)
vertical
seam
“inside
corrugation valleys”
outside
inside
5/16” flange
nuts used at
stiffeners
5/16” bin bolt w/seal
washer, typical
standard 5/16” nut