Owner`s manual
21
015886 5-02
BEFORE BEGINNING ASSEMBLY
IMPORTANT: Before construction of the bin is started: 1) Read
and understand this manual. 2) Determine the locations for all
accessories including the: access door, anchor bolts, ladder,
manway, side draw, roof steps, fans, and any other auxiliary
equipment. 3) In addition to these, consideration must be given
to the location of the: electrical and gas service, control unit,
winch/hydraulic unit, unloading auger, entry door, and any other
equipment that may be involved. Please note that the control unit
should be placed on the north or east side, out of direct sunlight.
space roof vents
evenly around bin 2nd fan platform
step across
platform when 2
fan units are used
fan platform
door platform
outside ladder
BASIC PLAN VIEW OF THE 36’ EZEE DRY
a










