Installation Instructions

3E-Z Build Shed Building Guide 10'×10' ∙ 10'×12' ∙ 10'×14' ∙ 10'×16' ∙ 10'×20'
STEP 7. DOOR FRAMING
STEP 9. SQUARE THE BUILDING
STEP 10. FLOOR SUPPORTS
Figure 7
Figure 9
Use the door cutouts from the front wall framing
for the doors. Cut 1×4 boards and attach to the
door siding interior. Extend the siding 1" out top &
sides. On (1) door extend a 1×4 board out 1" for
the center of one door; bring the 1×4 on the other
door in 1". Ensure bottom boards clear treated
end frame joist. Bend protruding 8d nails. Cut and
fasten 2×4 cross braces. Cut 1×4 boards and at-
hasp. See Figure 7. Attach 1×4 trim to the front
wall frame and fasten doors on top of the trim.
From treated 2×4s, cut rim joists:
• 119" for a 10' building • 143" for a 12' building
• 167" for a 14' building • 191" for a 16' building
• 239" for a 20' building
Place rim joists 10' apart at the shed location.
Stand the front and back walls up at either end of
the rim joists. Plumb and temporarily brace. Nail
rim joists to the end walls using 10d nails. Place a
temporary brace across the roof frame members.
Stand up the remaining frames. Nail rim joists to
frames at the dimensions shown in Figure 8.
At base of building, measure
diagonally. Adjust building until
AD=CB. Building is then
squared. See right.
Figure 9.
• 6 for a 10' building • 8 for a 12' building
• 10 for a 14' building • 12 for a 16' building
• 16 for a 20' building
Temporary braces
Standard
Frames
12' Building Shown
21¼"
22½"
22½"
143"
22½" 22½" 22½" 22½" 21¼"
1½"
Toe nail in place
supports.(typical)
1×4×6" gusset
plates at top and
bottom fold
locations (typical)
21¼"
22½"
22½"
1½"
Outside
edge of
frame to
outside edge
of frame
2×4
Brace
Treated end frame Joist
1"
1" Gap, Top & Sides
Interior View
1×4
Pine
Boards
Hinge
locations
12"
12"
82½"
Front end wall shown with
optional T1-11 siding
A
C
B
D
46¼"
46"
21¾"
21¼"
10'0"
10' × 12' Floor plan shown
Siding
2×4
Headers
Extra
2×12
Header
2×4 End
Frame
Rollup Door
Rollup
Door
Follow manufacturer's
installation instructions for
installing Roll Up door.
Siding
2×4
Headers
Extra
2×12
Header
Rollup Door