Installation Instructions

2 E-Z Build Shed Building Guide 10'×10' ∙ 10'×12' ∙ 10'×14' ∙ 10'×16' ∙ 10'×20'
Figure 2
Figure 5 Figure 6
STEP 4. FRONT AND BACK WALL FRAMING
STEP 5. BACK WALL SIDING STEP 6. FRONT WALL SIDING
Using (1) frame selected as an end wall, measure
and mark stud locations according to dimensions
shown in Figure 2. Place the proper length 2×4
studs at those locations. Mark required length and
angles. Cut each 2×4 to t. Nail or toenail studs
into place using (2) 8d nails top and bottom. For
the front wall, follow Figure 3 if installing double
doors or Figure 4 for a rollup door.
Cut one 4×8 sheet of siding in half, lengthwise,
leaving two 24"×96" pieces. Place two full 4×8
sheets and one 24"×96" piece, with cut edge away
from the full sheets, butted together face down on
the ground. Place the frame on top of the siding
and trace the roof line. Remove the frame and cut
siding. Properly place siding on the frame and nail
in place using 6d nails every 8" on center.
Cut the other 24"×96" piece in half, lengthwise,
leaving two 12"×96" pieces. Place two full 4×8
sheets and both 12"×96" pieces butted together
face down on the ground. Place front frame on
top and trace roof line and door area. Extend door
outline 1" larger in all directions for new "correct"
door lines. Remove the frame and cut siding.
Properly place siding on the frame and nail in
place using 6d nails every 8" on center.
NOTE: Some siding pieces will need to be butted together, so a straight cut is necessary. To keep moisture from “wicking” and soaking into the siding,
keep the bottom of the siding 1" above the bottom of the treated bottom frame member.
48"24"
48"
1"
Trace frame.
Cut lines.
Use scrap pieces to
cover at peak.
Figure 3
2×4 door header cut to t
Toe nail into place.
Install this piece FIRST.
2×4 door uprights
Measure and cut to t.
3½"
25" 25"
11" 11"
70"
79"
2×4 center nailer
cut to t
48"
36"
48" 12"12"
36"
1"
1"
Cut “correct” lines out
for doors.
Use scrap pieces to
cover at peak.
Figure 4
2×4 header
rollup door
support
Gusset plates to
inside of building
Rough
Opening for
Roll up door
6' W × 7' H
Vertical nailers, nailed
onto back of frame
24"
72"
84"
3½"
18¾" 18¾"20½"20½" 20½"
Toenail studs into place
(Typ).
2×4×8' end wall
studs cut to t.
Toenail
detail