Instructions / Assembly

Page 40 of 74
4.9.12. Insert adjustable elbows into the open ramp handrail, the Bolt-On Stub Rail and the
open ends of the welded handrail extension (FIG. 4.20).
4.9.13. Align the adjustable elbows and measure and cut the 1-1/2” diameter handrail tubes
connecting the ramp handrail and Bolt-On Stub Rail to the handrail extension.
Measure both upper and lower gaps because they could be different and cut tubes
accordingly. The procedure for installing the 1-1/2” diameter handrail tubes and
adjustable elbows is the same as the installing the closure top rail, refer β€˜CLOSURES’
section.
4.9.14. FIG. 4.20 shows the completed connection.
4.9.15. Make sure all fasteners on both sides are tightened securely.
FIG. 4.20