Instructions / Assembly

Table Of Contents
PATHWAY
®
3G Modular Access System Assembly Manual
Page 72 of 75
1
7.9.9. Locate the closure bracket and screw to the platform side rail using a 1/4” self-drilling,
self-tapping pan head Phillips screw and 1/4” flat washer.
7.9.10. Center the long leg of the closure bracket with respect to the 2” x 2” angle post and align
the short leg (approximately) with the 45-degree Angle Platform corner pocket, then
screw short leg to the platform side rail using a 1/4” self-drilling, self-tapping pan head
Phillips screw and 1/4” flat washer (FIG. 7.24).
7.9.11. Measure the gap between the long leg of the closure bracket and the 2” x 2” angle post,
then cut the 1-1/2” x 2” curb to the measured gap length less 1/8” to account for the
threaded inserts which will be installed after cutting (FIG. 7.24).
7.9.12. Debur all sharp edges from cutting the curb and insert 1-1/2” square, 5/16”-18 threaded
inserts in the ends. Use a rubber mallet or similar tool to fully seat the threaded inserts
(FIG. 7.24).
7.9.13. Attach the 1-1/2” x 2” curb to the closure bracket and the 2” x 2” angle post using 5/16”-
18 x 1” hex cap screws (FIG. 7.24).
It may be necessary to temporarily remove or reposition the platform leg to attach
the curb.
FIG. 7.24