Instructions / Assembly

Table Of Contents
PATHWAY
®
3G Modular Access System Assembly Manual
Page 67 of 75
1
7.7.12. If there are support tubes in the ramp run, the same method as described above for
platforms can be used. Otherwise, drill a 5/16″ hole below the tread surface (approximately
3/4″ above the bottom of the side rail) and between the ribs underneath the treads in each
of the side rails at the desired location.
7.7.13. Install one of the 5/16″ eyebolts and secure to the ramp using one 5/16″ flat washer and
one 5/16″ nut in each hole (FIG. 7.12).
7.7.14. Secure one end of the wire rope to the eyebolts using the supplied 3/16″ wire rope clamps.
7.7.15. Repeat for all locations.
FIG. 7.11
FIG. 7.12