Instructions / Assembly

Table Of Contents
PATHWAY
®
3G Modular Access System Assembly Manual
Page 54 of 75
1
5.6.4. Attach the Vertical Picket closure to the platform handrail post using 5/16”-18 x 3/4” long
hex bolts, 5/16” flat washers and 5/16”-18 nuts (FIG. 5.15). When centering the ramp, attach
one section (unassembled) to the platform posts on both sides of the ramp and secure in the
same manner.
5.6.5. Clamp the closure brackets to the ramp handrail post such that the long leg is in contact with
and centered on the upper and lower holes in the Vertical Picket closure (FIG. 5.16).
5.6.6. Install a 5/16″-18 x 1″ hex bolt through a 5/16” flat washer, the slot in the long leg of the
closure bracket, and the holes in the Vertical Picket closure. Use 5/16” flat washers and
5/16″-18 nuts to attach then tighten all fasteners securely (FIG. 5.17).
5.6.7. Unclamp the closure brackets and drive a 5/16”-18 x 1-1/4” self-drilling, self-tapping hex
washer head screw, centered in the slot, through the platform closure bracket and into
the ramp handrail post (5.17). Tighten securely but use caution not to overtighten and
strip the threads.
5.6.8. Repeat steps 5.6.5 through 5.6.7 on the opposite side when centering the ramp.
FIG. 5.15
FIG. 5.16
FIG. 5.17