Instructions / Assembly

Table Of Contents
PATHWAY
®
3G Modular Access System Assembly Manual
Page 43 of 75
1
4.6.12. Insert adjustable elbows into the open ramp handrail, the Bolt-On Stub Rail, and the open
ends of the welded handrail extension (FIG. 4.14).
4.6.13. Align the adjustable elbows and measure and cut the 1-1/2” diameter handrail tubes
connecting the ramp handrail and Bolt-On Stub Rail to the handrail extension. Measure both
upper and lower gaps because they could be different and cut tubes accordingly. The
procedure for installing the 1-1/2” diameter handrail tubes and adjustable elbows is the same
as the installing the closure top rail, refer to ‘CLOSURES’.
4.6.14. FIG. 4.14 shows the completed connection.
4.6.15. Ensure all fasteners on both sides are tightened securely.
FIG. 4.14