Instructions / Assembly

Table Of Contents
PATHWAY
®
3G Modular Access System Assembly Manual
Page 57 of 75
1
5.7.17. Drive 5/16”-18 x 1-1/4” self-drilling, self-tapping hex washer head screws, centered in the
slot, through the platform closure brackets and into the ramp handrail posts (FIG. 5.22).
Tighten securely but use caution not to overtighten and strip the threads.
5.7.18. Measure the gap between the long leg of the closure brackets, cut the 1-1/2” dia. tube to
the measured gap length less 1/8” and install 5/16”-18 round threaded inserts in the
ends of the tube as described previously (FIG. 5.22).
5.7.19. Attach 1-1/2” dia. tube with 5/16”-18 round threaded inserts installed to the brackets
using 5/16″-18 x 1″ hex bolts through 5/16” flat washers and tighten securely (FIG. 5.22).
5.7.20. The 8’ x 5’ Vertical Picket Closure can only be used with the 8’ x 5’ platform. Set the base
of the 8’ x 5’ Vertical Picket Closure on the platform side rail then drive 5/16-18 x 1-1/4”
self-drilling, self-tapping hex washer head screws, centered in the slots of the closure
brackets, through the brackets and into the ramp handrail posts (FIG. 5.23). Tighten
securely but use caution not to overtighten and strip the threads.
5.7.21. Attach the base of the 8’ x 5’ Vertical Picket Closure to the platform side rail using four
1/4″ x 1” long self-drilling screws (FIG. 5.23).
FIG. 5.22
FIG. 5.23