Instructions / Assembly

1
PATHWAY
®
3G Modular Access System Assembly Manual Page 69 of 77
7.7.12.
If there are support tubes in the ramp run, the same method as described above for
platforms can be used. Otherwise, drill a 5/16 hole below the tread surface (approximately
3/4 above the bottom of the side rail) and between the ribs underneath the treads in each
of the side rails at the desired location.
7.7.13.
Install one of the 5/16 eye bolts and secure to the ramp using one 5/16 flat washer and
one 5/16 nut in each hole (FIG. 7.12).
7.7.14.
Secure one end of the wire rope to the eye bolts using the supplied 3/16 wire rope clamps.
7.7.15.
Repeat for all locations.
FIG. 7.11
FIG. 7.12