Instructions / Assembly

1
PATHWAY
®
3G Modular Access System Assembly Manual Page 54 of 77
5.6.4.
Attach the Vertical Picket Closure to the platform handrail post using 5/16-18 x 3/4 long
hex bolts, 5/16 flat washers, and 5/16-18 nuts (FIG. 5.15). When centering the ramp, attach
one section (unassembled) to the platform posts on both sides of the ramp and secure in the
same manner.
5.6.5.
Locate the platform closure brackets and clamp the closure brackets to the ramp handrail
post such that the long leg is in contact with and centered on the upper and lower holes in
the Vertical Picket Closure (FIG. 5.16).
5.6.6.
Install a 5/16-18 x 1 hex bolt through a 5/16 flat washer, the slot in the long leg of the
closure bracket, and the holes in the Vertical Picket Closure. Use 5/16 flat washers and
5/16-18 nuts to attach, then tighten all fasteners securely (FIG. 5.17).
5.6.7.
Repeat steps 5.6.5 through 5.6.6 on the opposite side when centering the ramp.
FIG. 5.15
FIG. 5.16
FIG. 5.17