Full Product Manual

1
PATHWAY
®
3G Modular Access System Assembly Manual Page 43 of 77
4.6.12.
Insert adjustable elbows into the open ramp handrail, the Bolt-On Stub Rail, and the open ends
of the welded handrail extension (FIG. 4.17).
4.6.13.
Align the adjustable elbows and measure and trim the 1-1/2 diameter handrail tubes
connecting the ramp handrail and Bolt-On Stub Rail to the handrail extension. Measure both
upper and lower gaps because they could be different and trim tubes accordingly. The
procedure for installing the 1-1/2 diameter handrail tubes and adjustable elbows is the same
as installing the closure top rail (refer to CLOSURES).
4.6.14.
FIG. 4.17 shows the completed connection.
4.6.15.
Ensure all fasteners on both sides are tightened securely.
FIG. 4.17
4.6.16.
After installing ramp handrails, insert the Short Side Vertical Picket on the short side of the
45-degree Angle Platform. Align the bottom of the posts with the bottom of the corner
pockets and tighten the set screws securely. Install angle caps on top of each post (FIG. 4.18).
Refer to SECTION 4.4 for installing platform handrails and attaching angle caps.
4.6.17.
Insert adjustable elbows into both ramp handrails and install 1-1/2 diameter handrail
tubes in the same manner as described in HANDRAILS and shown in FIG. 4.19.