User`s manual
VersaTools
®
MTP 15HD RS Series • Installation
3. Locate jumper JMP1 on the serial data (top) board and shift
the jumper to bridge the jumper block (gure 1).
4
. Place the top cover back into place.
5. Reinstall the four screws removed in step 2. If any
mounting brackets were removed in step 1, put them back
into position as you reinstall the screws.
6
. If applicable, reinstall the receiver and reconnect all cables.
Installation
CAUTION
Installation and service must be performed by
authorized personnel only.
The 1U high, quarter rack width, MTP transmitter and receiver
can be mounted on a rack shelf, to a rack without a shelf, under
a desk or tabletop, or on a projector bracket.
Rack mounting
UL guidelines
The following Underwriters Laboratories (UL) guidelines
pertain to the installation of the unit into a rack.
1. Elevated operating ambient temperature — If the
equipment is installed in a closed or multi-unit rack
assembly, the operating ambient temperature of the rack
environment may be greater than room ambient.
Therefore, consider installing the equipment in an
environment compatible with the maximum 122° F (50° C)
ambient temperature (Tma) specied by Extron.
2. Reduced air flow — Installation of the equipment in a rack
should be such that the amount of air ow required for safe
operation of the equipment is not compromised.
3. Mechanical loading — Mounting of the equipment in
the rack should be such that a hazardous condition is not
achieved due to uneven mechanical loading.
4. Circuit overloading — Consideration should be given to the
connection of the equipment to the supply circuit and the
effect that overloading of the circuits might have on
overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be
used when addressing this concern.
7VersaTools
®
MTP 15HD RS Series • Installation