User guide
2. Select Create A New Project and click OK. The dialog box closes, leaving the
Project Settings screen.
Figure 35. Global Configurator Project Settings
3. Configure the device settings:
a. Enter the IP address for the IP Link control processor.
b. The default Telnet connection is port 23 and HTTP is port 80, so these values do
not usually need to be changed.
c. If necessary, set administrator and user passwords.
d. If required, set the date and time.
e. Checking the
Set Device as GlobalViewer Host box is optional. For more
information about what a GlobalViewer host is, see the Global Congurator help
file.
TLP 1000MV and TLP 1000TV • Conguration Software 30