User guide
5. The project can be uploaded to one or more TouchLink panels. To add a panel:
a. From the Project menu, select Add > Panel:
Figure 32. Add a TouchLink Panel
The Panel Manager dialog box opens:
Figure 33. Panel Manager Dialog Box
b. Click the Add Panel icon (shown to the right) to add a new panel to
the left pane.
c. Highlight the name of the panel in the left pane to display the
properties of that panel in the right pane.
d. The default IP address (192.168.254.254) is assigned to any new panel that is
added. To change the IP address, highlight the address property in the right pane
and type in the correct IP address. Update any other properties, as required.
e. Repeat steps 5b - 5d to add further panels, if required.
6. To upload a project to a TouchLink panel:
a. From the Project menu, select Upload to Selected Panels. The Build
Manager dialog box opens, showing the build progress. After the build is
complete, this dialog box closes and the File Upload Manager screen opens. The
upload begins automatically.
b. Select Close this dialog when upload completes check box in the
Automatic Settings section so that the File Upload Manager screen closes
automatically when the upload completes. This option can be set before or during
the upload.
TLP 1000MV and TLP 1000TV • Conguration Software 28