Installation guide

TeamWork 400 and TeamWork 600 Kits • Installation Guide (Continued)
4
Installation
Install the Power Modules in the Cable Cubby
Detailed instructions are in the Cable Cubby Setup
Guide.
Extron recommends the layout shown to the right
with AAP shelf assemblies on either side of the power
modules.
NOTE: Depending on your country, a power
module may occupy two or three AAP spaces,
so your nal conguration may look slightly
different.
Secure the power modules in position with the provided
#4-40 Phillips head screws and star washers.
WARNING: Possible electric shock: To ensure
good electric grounding, you must use the star
washers with the screws.
Install the AAP Shelf Assembly and ShowMe Cables
INPUT
(to source device)
Top of Cable Cubby
OUTPUT
(to switcher)
Bottom of
Cable Cubby
Share Button
Three-conductor
pigtail for contact
closure and tally
ATTENTION:
• The end with the button and LED
connects to the input devices and must
come out of the top of the Cable Cubby.
• The end with the three-conductor pigtail
connects to the switcher and must come
out of the bottom of the Cable Cubby.
1. Assemble the AAP shelf assembly.
2. Insert the AAP assemblies into the Cable
Cubby from underneath and secure them
in position with the provided #4-40 Phillips
head screws and star washers.
125 50/60HZ
5A EACH
UNSWITCHED
125 50/60HZ
5A EACH
UNSWITCHED
Power Module
AAP Shelf Assembly with
Cable Pass-through
Blank AAP
Split Grommet
“Show Me” Cable
“Show Me” Cables must
be inserted into shelf
Assemblies as it is
being constructed.
Plug
AAP Shelf
Assemblies
Shelf
Brackets
a
b