User Manual
PoleVault Systems Installation • Optional Accessory Installation
2-32
Optional Accessory Installation — PPC 25
POWER
C NO
PAGING RELAY
DELAY
SENSITIVITY
12V
0.2A
MAX
ON
1
2
L R
AUX/MIX IN
DO NOT GROUND
OR SHORT
SPEAKER OUTPUTS!
1B
1A
I
N
P
U
T
S
O
U
T
P
U
T
S
2B
2A
3B
3A
RS-232 MLC/IR
DC VOL
4/8 Ohms
AMPLIFIED OUTPUTS
VOL/MUTE
Tx
A BC
Rx IR 12V
10V
POWER
12V 
3A MAX
US
LISTED
 17TT
AUDIO/VIDEO
APPARATUS
®
RGB
VIDEO RGB
VIDEO
To  Power
Supply
Extron
PPC 25
Priority Page
Controller
Extron
PVS 204SA
Twisted Pair
Switcher
10
 Connect the power supply via the 
 PoleVault switcher
9.  If a junction box is being used in a plenum space, ensure the 
sensor and all wires fit inside the box (as shown at right). All 
cables leaving the box must be plenum rated. Tighten the 
cable clamp and secure the lid to the junction box.
10.  Use the included Y-shaped cable assembly to power the 
Priority Page Controller from the PVS 204SA power supply 
(as shown). This cable assembly allows both devices to be 
powered from a single power supply.
9
 Ensure the sensor and wires fit 
 completely inside the junction box 
 before attaching the cover










