User Manual
2-9
PoleVault Systems Installation • Installation — Stage 2
  PVT transmitter installation
  • CAT 5 568A signal transmission cables (connects  
    PVT’s to PVS 204SA switcher)
  MLC 104 IP Plus installation
  • MLC power and RS-232 control cable (connects 
    the MLC to the MLC/Power control port on the 
    PVS 204SA switcher)
  • IR/RS-232 communications cable control cable 
    (connects the MLC to the projector via RS-232  
    or to an IR emitter)
  • LAN network cables (not supplied - connects 
    the MLC to LAN)
MLC, PW/RS-232/VC, 50'
IR SERIAL COMM, 50'
CAT 5 Patch, 50'
Cables










