PoleVault Systems Installation • Installation — Stage 1
T
  Install any optional power outlets in the 2 gang opening 
on the mounting plate, towards the outside edge of the 
mount, so it does not interfere with the PMK 450 when 
installed. 
C
  For safety, all wiring of the electrical boxes and 
  accessories should be completed after the plate is 
  fully installed and secure.
7. Install the Screen
a.  Following the screen manufacturers guidelines, continue 
to install the screen mounting brackets and then hang the 
screen.
T
  Use S-hooks to hang the screen from the brackets.
Bend the ends of the S-hooks so the screen does not fall 
when it is rolled up.
PMK 450
T-bar
PCM 240 
(viewed from
above) 
Install power outlet
in the 2-gang cutout
(RACO box installed).
T Power outlet installation on the 
  PCM 240
g.  Pass the safety cable through the fifth and center anchor 
and attach it to the center holes on either side of the plate.  
Ensure the cable is of equal length on both sides of the 
anchor and secure the cable using the cable clamps.
 Attach the safety cable to the PCM 
Attach safety cable
to center holes and 
secure with cable
clamps.
6g