Installation — Stage One, cont’d
6. Secure the Projector Ceiling Mount  
to the ceiling
a.  Attach the four turnbuckles to the mounting plate, one at 
each corner.
C
  DO NOT rest or lean on the mounting plate or 
  suspended ceiling when attaching turnbuckles, 
  tie wire, or when drilling into the ceiling
N
  For safest installation, insert the turnbuckle from 
  the outside so that it hooks inwards.
b. Mark and drill holes at 10 degrees out from vertical. 
Drill a fth hole directly centered above the PCM 240 for 
the safety cable.
c.  Install appropriate anchors or lag eye-bolts for the 
structural ceiling into each drilled hole
d. Cut four equal lengths of the supplied hanging wire, and 
loop the wire through the anchors or eye screws, and the 
turnbuckles, then twist the wire around itself at least five 
times tightly.
e.  Hand tighten the turnbuckles, and level the plate so it 
just rests on the T-grid. 
C
 The four hanging wires should be taut, taking 
  the full weight of the completed installation.
    Do not overtighten the turnbuckles or the 
  T-bar assembly could be lifted, making the 
  suspended ceiling bowed and unsafe.
f.  Tighten the four T-bar securing screws on the PCM 240.
C  DO NOT rest or lean on the plate or 
suspended ceiling grid during 
installation of safety cable, or during 
installation and wiring of electrical 
boxes, accessories, and projector. 
6a
 Attach turnbuckles at the corners
PCM
T-bar
Adjust the turnbuckles to take
up any slack in the hanging wire.
6e
 Tighten the turnbuckles
6b
 Mark structural ceiling for lag bolt 
  installation