User Manual
PoleVault Systems Installation • Installation — Stage 1
2-4
Installation — Stage One, cont’d
e.  Using suitable screws, mount the projector onto the 
lower portion of the UPB 25 (the projector bracket, as 
shown in step 2e’s image). Align it so the security flange 
is at the rear. A minimum of three arms need to be 
attached to the projector Adjust the arms to fit as needed.  
Lock down the arm adjustment screws.
T
  Adjust the threaded barrels at the end of each 
arm to keep the bracket level.
f.  Lift the projector up to the mount plate and slide it into 
place. Tighten down the locking and pivot screws.
3. Verify the image location
a. Connect a power cable to the projector and turn it on.
b. Verify image size and location by loosening the 
PCM 240 pipe adapter plate locking nuts, and adjust the 
plate (left-right) to center the image.
T
  Remember to include the vertical and horizontal offsets 
when aligning the projector. Refer to the projector 
manual for information.
c.  When satised lock down the plate locking nuts.
Projector
Center Line
Lens
Center Line
Measure the 
horizontal offset
Security 
Flange
2f
 Slide and lock the projector onto the 
  adjuster plate 
2e
 Attach the bracket to the projector 
T  Horizontal offset 










