Manual
Ü
 Slide the covers onto the PMK 560.
g.  Where installed, it may be necessary to adjust 
the sensitivity of the Priority Paging system. 
During a test transmission of the paging system 
rotate the Paging Sensor encoder until program 
audio is no longer heard from the PoleVault 
speakers. See the Priority Page Sensor 
Installation Instructions, or page 67 of this 
guide, for full details.
NOTE:  The Paging Sensor feature must be 
enabled using the MLS Configuration software 
or SIS commands prior to adjustment.
4. Final Installation.
a.  Slide the covers of the PMK onto the base 
plate, ensuring the power cable can exit the unit 
through the power cable access slot.
b.  Using a 5/32 inch hex wrench, tighten down the 
four screws on the PMK to secure the sides in 
place.
c.  Check and tighten the adjuster plate locking 
screws on the projector bracket.
d.  Hole plugs can be used to cover any exposed 
holes in the slotted pipe if necessary. 
PoleVault Digital Systems • Installation — Stage 5 (Configuration) 65










