Setup Guide Instruction Manual
Table Of Contents
- Front cover
- Safety Precautions
- Safety Precautions (Chinese) and FCC Class A Notice
- Table of Contents
- Ch. 1: Introduction
- Ch. 2: Hardware Setup
- Ch. 3: Software Setup
- Creating a Global Configurator Project File
- Configuring a New Device
- Step six: configure e‑mail server (IP models only)
- Step seven: configure e‑mail messages (IP models only)
- Step eight: configure contacts (IP models only)
- Step nine: assign serial device drivers
- Step ten: assign IR drivers
- Step eleven: configure the front panel
- Step twelve: configure associated control modules
- Step thirteen: create a shutdown schedule
- Step fourteen: create a lamp hour notification (IP models only)
- Step fifteen: create a disconnect notification (IP models only)
- Step sixteen: build the Global Configurator file
- Step seventeen: upload the Global Configurator file
- Step eighteen: launch GlobalViewer (IP models only)
- Testing the GlobalViewer pages
- Warranty
- Back cover:checklist and contact information

ii
MLC 104 Plus Series • Table of Contents
Table of Contents, cont’d
68-1289-01 Rev. D
11 08
All trademarks mentioned in this manual are the properties of their respective owners.
Step nine: assign serial device drivers ................................ 3-14
Step ten: assign IR drivers ................................................... 3-15
Step eleven: congure the front panel .............................. 3-16
Button caption .....................................................................3-16
Button tool tip ......................................................................3-16
Button repeat rate ................................................................3-17
Button modes .......................................................................3-18
Switcher input ......................................................................3-19
Button operations ................................................................3-20
Clear, reset, and auto ll captions .......................................3-24
Step twelve: congure associated control modules ......... 3-25
Step thirteen: create a shutdown schedule ....................... 3-27
Step fourteen: create a lamp hour notication (IP models
only ...................................................................................... 3-29
Step fteen: create a disconnect notication
(IP models only.................................................................... 3-31
Step sixteen: build the Global Congurator le ............... 3-33
Step seventeen: upload the Global Congurator le ....... 3-34
Step eighteen: launch GlobalViewer (IP models only ...... 3-35
Testing the GlobalViewer pages ......................................... 3-36