User guide
CIA111 and CIA114 • Installation and Operation
Installation, cont’d
2-12
CIA111 and CIA114 • Installation and Operation
2-13
Mounting the interface to the wall box
1.  Remove power from the interface by disconnecting the 
power supply.
2.  Place the interface through the opening in the wall or 
furniture and into the wall box. Take care not to damage 
the cables, which fit behind the interface, at the back of the 
wall box.
3.  Mount the interface’s faceplate to the wall box with the 
provided machine screws (figure 2-8).
2-gang
Wall Box
Au
t
o
Po
w
er
A
U
D
I
O
I
N
P
U
T
M
O
N
I
T
O
R
O
U
T
P
U
T
I
M
A
G
E
S
H
I
F
T
N
O
M
O
N
I
T
O
R
C
O
M
P
U
T
E
R
I
N
P
U
T
Extron
CIA111
Figure 2-8 — Mounting the interface to the wall box
4.  Reconnect the power supply and restore power to the 
equipment.
Mounting the CIA114F5
The CIA114F5 is designed to fit into a Steel City 665 floor box 
(figure 2-9). The installation must conform to national and local 
electrical codes and to the interface’s size requirements.
C
  The interface must be installed into an 
Underwriters Laboratories (UL) approved 
Steel City electrical floor box. The floor box is 
not included with the interface; the installer is 
responsible for obtaining and installing the box.
Figure 2-9 — CIA114F5 installed










