User`s manual

SCP 250
2
Chapter Two
Installation and Operation
Installation Overview
Preparing the Site, Installing the Electrical Box
Rear Panel Connectors and Switches
Cabling
Front Panel Features and Operation
Testing/Troubleshooting
Mounting the SCP to the Electrical Box