User Guide
Installing the CS 120P in a Suspended Ceiling — Division of Labor
In a division of labor installation, low-voltage contractors install the CS 120P enclosure 
(construction rough-in phase). 
NOTE:  The ceiling grid must be installed before the installation of the CS 1226T can 
begin.
• Verify if fiberglass ceiling tiles are being used (see step4d on the next page and 
step10 on page 18 for details).
• The grid face must be at least 15/16 inch (24 mm) for proper installation of the 
CS 120P (see step12 on page 19 for details on suspending the enclosure on a 
smaller grid face). 
Side View
15/16" (24 mm)
Grid Face
Figure24. GridFaceExample
Use the following procedure:
1. Disconnectpower —  Power down all attached devices before proceeding.
2. Verifythespacewherethesystemwillbeinstalled — Ensure that there is sufficient 
clearance above the ceiling tile for the unit to be installed.
3. ConfiguretheCS120PforaU.S.ormetricceilinggrid — For U.S. ceilings (2 feet 
by 2 feet or 2 feet by 4 feet), leave intact the four tabs that are on one of the short ends 
of the enclosure. 
For metric ceilings (600 mm by 600 mm or 600 mm by 1200 mm) cut off the tabs.
Tabs (4)
Removable
Tabs
Figure25. TabsontheCS120P
CS26TandCS120PUserGuide•Installation 15










