Installation Guide

Table Of Contents
Follow these steps to connect a SummitStack 64G/20G cable:
1. Connect the 64-Gbps connector to the VIM2 module as follows:
a. Holding the cable connector with the release tab on top, align the connector with the stacking
port on the VIM2 module in the Summit X480 series switch.
Figure 241: Connecting the 64G Connector
b. Firmly press the cable connector into the stacking port until the spring latch on top of the
connector clicks into place.
2. Connect the 20G connector as follows:
a. Align the cable connector with the stacking port connector on the rear of the switch (see Figure
242).
b. Firmly press the cable connector into place on the mating stacking port connector.
c. Align and tighten the retaining screws on the cable connector.
Figure 242: Connecting the 20G Connector
Connecting Stacking Cables
Building Stacks
310 Summit Family Hardware Installation Guide