Installation Guide

Table Of Contents
Figure 230: Cable Management Using Tie-Wraps and a Stand-O
Port Covers on the VIM1-SummitStack512 Module
On the VIM1-SummitStack512 module, EMI-protective covers are installed over the port connectors.
Before connecting the stacking cables, remove the connector covers from the ports that will be used.
To remove a connector cover:
1. On the side of the connector nearest to the inserter/ejector lever, find the notch between the two
end tabs on the cover (see Figure 231).
2. At the notch, set a small flat-blade screwdriver firmly against the connector housing.
Figure 231: Removing a Connector Cover
3. Brace the screwdriver against the module inserter/ejector lever and pry the end of the connector
cover loose.
Connecting Stacking Cables
Building Stacks
302 Summit Family Hardware Installation Guide