Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this release
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Chapter 6: Translations of safety messages
6. Use the following steps to install the switch in the equipment rack to complete the
installation:
a. Insert the chassis rails on the switch into the rack rails on the frame.
b. Pull the blue locks on the chassis rails towards the front and slide the switch into the
frame.
Installing the Avaya Virtual Services Platform 7200 Series
October 2015 Installing the Avaya VSP 7200 Series 48
Comments on this document? infodev@avaya.com










