Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this release
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Chapter 6: Translations of safety messages
e. Close the bracket assembly so that it wraps around the frame and locks into place.
f. Repeat the above steps on the rear bracket.
g. Repeat these steps for the rack rail on the other side of the frame.
Installing the switch in an equipment rack
October 2015 Installing the Avaya VSP 7200 Series 47
Comments on this document? infodev@avaya.com










